Project coordination
Information tracking, cross-discipline consistency review and deliverable organization within the professional team.
Project coordination and multidisciplinary BIM production for a residence located in Tola, Rivas.
01 / 07Juan Carlos Quintanilla focused on organizing and coordinating architectural deliverables and building-systems models. This case demonstrates production and coordination experience; it does not attribute the original architectural design to JQ-BIM.
Information tracking, cross-discipline consistency review and deliverable organization within the professional team.
Development and coordination of the architectural set and As-Built drawings in Autodesk Revit.
BIM modeling of plumbing systems for integration with architecture and project documentation.
BIM modeling of HVAC components and spatial coordination with the architectural model.
The views show the model used during the professional coordination and documentation process.






Juan Carlos Quintanilla participated in this project as a member of a professional team. His scope included project coordination, As-Built documentation, and architectural, plumbing, and HVAC BIM modeling. JQ-BIM presents this case exclusively to describe that contribution and does not claim authorship of the architectural design or ownership of the project. The corresponding rights belong to their respective holders.
The images will remain in a local draft until written publication authorization and final credits are confirmed.We can review the available information and define a modeling, documentation or coordination scope.
Start an inquiry